The Right Approach: Quick & Easy 6S to Reduce Handling Issues


Reading time ( words)

Introduction

Handling is often the source of many pain points for PCB fabricators, resulting in rework, scrap and customer returns. Quick & Easy 6S is a fantastic tool to minimize handling risk by reducing product travel and improving shop cleanliness.

6S Methodology

6S (Figure 1) is literally five Japanese words beginning with the letter S, plus Safety, which together form a systematic process for organizing a workplace. While this may seem to be a minor tool in the war on waste, the benefits include quality and safety improvements, leadtime reduction, reducing hidden waste, and of course, increased profits. Below we will explore what the six Ss are and why they are important.

Sort (Seiri): Ensuring each item in a workplace is in its proper place or identified as unnecessary and then removed; it’s simply getting rid of unnecessary stuff.

Questions to ask:

Can this task be simplified?

Do we label items properly and dispose of waste frequently?

Set in Order (Seiton): Arrange materials and equipment so that they are easy to find and use. Prepare and label storage areas using paint, tape, outlines, or color-codes. Shadow boards are a great way to identify the type and location of tools (Figure 2).

Questions to ask:

How much time is spent looking for things and putting things away?

Can we improve the ergonomics of this task?

Shine (Seiso): Repair, clean and shine work area; in other words, “everyone is a janitor” (this is a concept that U.S. workers have a difficult time embracing!). Aside from any safety or health risks, employees honestly perform better in a neat and clean environment.

Read the full article here.

 

Editor's Note: This article originally appeared in the May 2016 issue of The PCB magazine.

Share




Suggested Items

I-Connect007 Editor’s Picks: Five Must-Reads for the Week

06/10/2022 | Nolan Johnson, I-Connect007
PCB fabrication is back in the news this week and posting high readership numbers as well. Among the most-read news, we see industry leaders changing roles, capital equipment shipment milestones, operational cost efficiencies, and, last but not least, cybersecurity.

Time, Space, Structure, and Model Analysis of CCL Price Increase

04/19/2021 | Hu Yang, Zhongtai Securities Research Center
According to the CCL Association, copper foil accounts for the largest proportion of raw materials (traditional CCL uses epoxy resin, glass fiber cloth and copper as raw materials). Copper foil in thin plate accounts for about 30% of the overall cost; in thick plate copper accounts for 50%. In CCL production, using Shengyi Technology and Chaohua Technology as examples, the cost of raw materials accounts for about 88% of the total cost, with labor accounting for about 4%. Other costs such as equipment depreciation account for about 8%.

After Decades of E-Textiles Work, a Rising Star Award

03/30/2021 | Vladan Koncar, ENSAIT
After decades of work in my field, I was awarded the Rising Star award during IPC APEX EXPO 2021. I would like to thank my research team, all the colleagues from the D-75A-EU E-Textiles Wearables Standard Task Group in Europe, Chris Jorgensen from IPC, and Sigrid Rotzler, the Task Group vice-chair. Last but not least, I would like to express my thanks to IPC CEO John Mitchell for this award.



Copyright © 2022 I-Connect007. All rights reserved.